Takes off quantities from a DXF facility drawing, builds a bill of materials with prices, checks design rules and marks the findings on the drawing.
Task overview
Input
Attachments
Bldg-B-3F-piping.dxf
Request
Build the piping bill of materials and mark design-standard violations on the drawing.
Company data to connect
Material master · Design standard
Processing steps
- Take-off
- prices
- rule check
- mark-up
Output
Result files
Bldg-B-3F-piping-BOM.xlsxBldg-B-3F-piping-review.pngCompletion check items
- Amounts, subtotals and total recomputed
- The answer's total matches the bill
- 1 Excel · 1 PNG
Sample run
Build the piping bill of materials and mark design-standard violations on the drawing.
A sample screen. Real steps and times depend on the model and the files.
Sample data
All file names and figures are sample data.
Bill of materials · priced
| Item | Qty | Amount |
|---|---|---|
| Steel pipe 50A | 112 m | 3,920,000 |
| Steel pipe 80A | 68.6 m | 3,200,200 |
| Gate valve 50A | 9 EA | 1,620,000 |
| Butterfly valve 80A | 6 EA | 2,380,000 |
| Total | 11,120,200 |